Category

Case Study
Biorefinery

Metallurgical Support for Biorefinery Navigating Critical Material Remediation

/ / / /
A biorefinery company was facing challenges with the air tubes utilized in a high-temperature application. The customer’s engineering team reached out to CRA for assistance in identifying a suitable replacement material that could withstand the demanding conditions of their biorefinery operations. 
View Details

Just-In-Time Manufacturing Helps OEM Meet Annual Financial Target

CRA received an urgent request from a major oil service company seeking to provide corrosion resistant alloy material for use in manufacturing of downhole completion tools for an oil and gas operator. To win the order, the oil service company would have to manufacture the products in Houston, TX and deliver the products to the […]
View Details
CRA 2550E 140 Grade for Severe Sour Service
Material Handling

Flexible Solutions for Long-Length Tubing on a Short Timeline

CRA received an urgent request from a major oil service company seeking to provide corrosion resistant alloy material for use in manufacturing of downhole completion tools for an oil and gas operator. To win the order, the oil service company would have to manufacture the products in Houston, TX and deliver the products to the […]
View Details

Oilfield Equipment Manufacturer Turns to Reliable Source for High Alloy OCTG

CRA received an urgent request from a major oil service company seeking to provide corrosion resistant alloy material for use in manufacturing of downhole completion tools for an oil and gas operator. To win the order, the oil service company would have to manufacture the products in Houston, TX and deliver the products to the […]
View Details
Innovative selection of tubulars outside
Nickel Alloy Pipe

A Collaborative Solution After an Unexpected Project Change

/ /
A customer approached us with a need for 60’ of large OD, specialty alloy 625 seamless pipe to be used in a marine application for the Department of Defense. With standard mills and distribution sources requiring minimum order quantities, the customer faced being forced into over purchasing to acquire the material they needed, ultimately driving […]
View Details

Accommodating Non-Standard Mill Quantities Cuts Cost for DoD Project

/ /
A customer approached us with a need for 60’ of large OD, specialty alloy 625 seamless pipe to be used in a marine application for the Department of Defense. With standard mills and distribution sources requiring minimum order quantities, the customer faced being forced into over purchasing to acquire the material they needed, ultimately driving […]
View Details
Department of Defense - Marine
Just-In-Time Manufacturing for CRA OCTG

Meeting Urgent Requirements Avoids Costly Project Delay

/ /
CRA was introduced to a customer who had a two well urgent requirement in the Kurdistan region of Iraq. The customer had a commitment to the government and needed to start drilling the first well within 12 weeks or they risked losing their blocks. They needed three nickel alloy sizes for tubing and liners. Traditional […]
View Details

Measuring An Operator’s True Cost Of Inventory

The downturn in the oil and gas sector has caused companies to review the true cost of holding inventory. A major oil company in the US has determined through an external consulting firm that the actual cost to hold inventory is 25% per year of their original product cost.
View Details
Reflective CRA pipes
1 2